In 1993 the power grid connections in the Berlin-Brandenburg funds region were being renewed. In a lot of the interior districts of Berlin electricity strains are underground cables; only a 380 kV in addition to a one hundred ten kV line, which operate from Reuter substation for the city Autobahn, https://ny21975.eveowiki.com/664971/5_essential_elements_for_and