The height of the bottom beam normally will depend on the predicted level of the ground floor slab. I've seen numerous configurations. In some cases, the very best with the beam flushes Using the top in the pile cap, even though occasionally it rises higher than the pile cap and https://stephenm776kdv8.blog-gold.com/profile