Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system built to comply with strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://ticketsbookmarks.com/story20566088/penmann-ltd-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2